Environmentally friendly processing of construction wasteWorking for the environment

At the Himberg Recycling Centre, we take care of the professional processing of brick and concrete demolition waste, as well as mineral building construction waste. In line with the principle of sustainable use of raw materials, these are turned into high-quality recycled products.
A significant part of our core business is the service-oriented disposal of construction waste. Our customers include both commercial buildings and private individuals.
Our Vienna site in Seybelgasse serves as a collection point and temporary storage facility for non-hazardous and hazardous waste. We separate mineral construction waste, excavated material, construction and demolition wood, as well as construction site waste at the site and send it for professional recycling or disposal. Other areas of service include the production of roof substrates as well as the sale of sand, gravel and grit.
An eventful historyRecycling over six decades
1962
Founding of Dorfer & Co for the production and utilisation of brick chips in Himberg.
1973
Conversion and construction of a concrete mixing and dosing plant.
1993
Expansion of the site to include a construction waste recycling plant for building construction waste.
1997
Expansion of the Himberg site to include a storage area for construction waste, concrete demolition, asphalt demolition and recycled materials.
1999
Takeover of Dorfer & Co by Böhm Transport Gesellschaft m.b.H.
2003
Conversion and expansion of the stationary construction waste recycling plant.
2007
Takeover of Böhm Transport Gesellschaft m.b.H. by Prajo-Böhm Recycling GmbH.
Complete renovation and conversion of the existing plant.
2013
Acquisition of Prajo-Böhm Recycling GmbH by PORR Umwelttechnik GmbH.
Modernisation and expansion of the site.
2015
Acquisition of the Vienna location in Seybelgasse from PRAJO & Co GmbH.
2018
Prajo-Böhm Recycling GmbH is renamed RCH Recycling Center Himberg GmbH.
2019
Conversion of the stationary recycling plant to state-of-the-art technology.
2021
Commissioning of a processing plant for artificial mineral fibres.
2023
Construction of a concrete mixing plant at the Himberg site and construction of a processing plant for bed bags.

The secret to our success?A well-coordinated team
The success of our projects is based on the interaction of experienced specialists, clear processes and partnership-based cooperation. Thanks to well-coordinated teams, in-depth expertise and mutual trust, we implement construction projects efficiently, on schedule and to a high standard of quality.